Engineering

  • Hydrology and Hydraulic Modeling
  • Water Quality Modeling
  • GIS
  • AutoCAD
  • Paving and Drainage Plans
  • Design of Restoration Projects
  • Stormwater Master Plans
  • Flood Studies/Watershed Studies
  • Climate and Rainfall modeling and analysis

Permitting

  • Environmental Impact Statements/Environmental Assessments & Related Federal Permit Requirements (404, Section 10, Rivers and Harbors Act, & Clean Water Act)
  • PD & E Studies (FDOT Preapproved for Small Projects)
  • Environmental Resource Permits (ERP)
  • Consumptive Water Use Permits
  • Dewatering Permits
  • Well Construction Permits
  • Phase I and II Site Environmental Assessments
Broward County and other municipalities in South Florida require: Licensed projects shall be renewed sixty (60) days prior to expiration (typically every 5 years). Each renewal shall be accompanied by the applicable fee, a log of the operation and maintenance schedules for all components of the surface water management system, and a certification letter signed and sealed by a Florida registered professional engineer certifying that the components of the surface water management facilities are functioning as originally licensed.

SFEC will provide the following:

1. Review. Review Swater Design Plan and As-built Drawings prior to site visit.

2. Inspection (1). Perform Site visit/inspection. This task will be conducted by a Licensed Professional Engineer to identify maintenance needs on the surface water system and identify any modifications from the As-built Drawings, design plans or design standards.

3. Report. Provide a written report on the observations from the site visit. This report will identify any maintenance needs and/or modifications to the surface water system. If there are no maintenance needs or modifications that need to be addressed, a Letter of Certification will be signed and sealed, and work will be considered to be complete.

4. If indicated in the Report, the Client, will be responsible for performing needed maintenance and/or modifications on the system to bring any identified deficiencies up to design standards. SFEC can assist in finding contractors. The cost for any maintenance, modifications, survey work or engineering drawings is not included in this proposal.

5. Inspection (2). Perform a second site visit upon completion by the Licensee of needed maintenance and/or modifications. This inspection is to verify that maintenance has been performed and that the system is ready to be inspected by Broward County. If the system is ready for inspection by the County, a Letter of Certification will be signed and sealed, and provided to the Client.

6. The Client will be responsible for submitting the Letter of Certification and any fees to Broward County. Broward County will then inspect the surface water system and point out any deficiencies. If any deficiencies are found the Client will be responsible for bringing the system up to code.

7. Inspection (3). Perform, if needed, a third and final site inspection. Provide another Letter of Certification, signed and sealed upon completion of the maintenance work identified by Broward County.

Environmental

  • Watershed Studies
  • Habitat Restoration
  • Water Quality Monitoring and Evaluation
  • Stormwater Treatment
  • Ecohydrology
  • Habitat Assessments /Evaluation of Ecosystem Structure and Function
  • Impact Assessment and Minimization
  • Experimental Design
  • Landscape Ecology
  • T & E Species Evaluations
  • Floristic Surveys
  • Periphyton/Algal Taxonomy
  • Performance Measure Development and Application
  • Scientific Peer Review

CAGE: 7G8L1

DUNS: 082496606s

NAICS

  • 541330: Engineering
  • 541618: Other Management, Consulting
  • 541620: Environmental
  • 541690: Scientific & Technical Consulting
  • 334513: Water Quality
  • 541370: Surveying & Mapping – GIS
  • 926150: Regulation, Licensing, & Inspection
  • 541611: Administrative Management & General Management, Strategic Planning
  • 541990: All other professional scientific and technical services
  • 541614: Process, Physical distribution, Logistics & Consulting Services
  • 115310: Support Activities for Forestry
  • 541370: Surveying & Mapping except Geophysical
  • 712120: Historical sites

CAGE: 7G8L1

DUNS: 082496606s

NAICS
  • 541330: Engineering
  • 541618: Other Management, Consulting
  • 541620: Environmental
  • 541690: Scientific & Technical Consulting
  • 334513: Water Quality
  • 541370: Surveying & Mapping – GIS
  • 926150: Regulation, Licensing, & Inspection
  • 541611: Administrative Management & General Management, Strategic Planning
  • 541990: All other professional scientific and technical services
  • 541614: Process, Physical distribution, Logistics & Consulting Services
  • 115310: Support Activities for Forestry
  • 541370: Surveying & Mapping except Geophysical
  • 712120: Historical sites

Our Commitment to Quality

SFEC is committed to delivering quality products on time and within budget. SFEC Project Managers work closely with our clients project managers to ensure that all tasks and schedules are clearly outlined from the start of the project. SFEC has a strong track record of delivering products on time and frequently prior to deliverable dates. Given our rigorous QA/QC, continuous improvement, and continuing education programs, all products meet or exceed the needs of our clients. SFEC’s staff have authored many of the QA/QC protocols utilized by local and State agencies. Our products undergo internal team review and external peer review prior to being delivered to our clients. Additionally, our team includes expert technical writers and technical editors, with years of experience in the fields of ecosystem restoration, water quality, modeling, and hydrology. These internal processes along with detailed project management and ongoing communication with our client’s Project Manager will ensure quality products delivered for each task both on-time and within the established budget.

Contact Us

Environmental Solutions through Science and Technology